Tenant improvement plumbing in Concord & the Bay Area.
New restrooms, kitchens, and utility rough-ins — on your schedule.
Restaurants, medical offices, retail buildouts, and commercial suite renovations. We coordinate with your GC, pull our own permits, and deliver rough-in and finish work on the timeline your lease requires.
- We pull our own permits — Licensed plumbing contractor — we handle permitting and inspection coordination.
- GC-ready scheduling — We show up when the slab is ready, work around other trades, and don't add PM load.
- Full scope, start to finish — Rough-in, finish work, fixture connection, and final inspection — one contractor.
- CA Lic. #802256 — Licensed, insured, and family-owned since 2001.

TI Plumbing Specialists
On-time, on-budget
What We Do
Full-scope TI plumbing,
permit to punchlist.
Tenant improvement plumbing ranges from adding a single hand sink to a full restaurant kitchen or multi-stall restroom block. Whatever the scope, we work from your architectural drawings, pull our own plumbing permits, and coordinate with your GC and the city's building department.
We've worked on restaurants, medical suites, fitness studios, retail build-outs, and office TIs throughout Contra Costa County and the Bay Area. If your lease has a delivery date, we build our schedule around it.
Request a TI bidHow It Works
Plans to punchlist,
without the runaround.
- Step 1:
Review Plans & Scope
We work from your architectural drawings or create a scope from site conditions. We flag any conflicts or code issues before work begins.
- Step 2:
Pull Permits & Coordinate
We handle our own plumbing permits and coordinate inspection scheduling with your general contractor's timeline.
- Step 3:
Rough-In & Finish
New supply, drain, and vent rough-ins; fixture installation; fixture connection and testing. We work around other trades.
- Step 4:
Final Inspection & Signoff
Permit inspection coordinated and passed. As-built documentation provided for your records.

Project Fit
Working with a GC or managing the buildout yourself?
We've worked both ways. Here's how we fit into your project regardless of how the team is structured.
How we fit into your project
You have a GC
We work as the licensed plumbing sub. We pull our own permits, show up on schedule, and coordinate inspections without adding to your PM load.
You're self-managing the TI
We can be your primary point of contact for plumbing scope, permitting, and inspection. We've done it many times.
Design is still in progress
We can review plans early and flag plumbing conflicts before they become change orders.
Signs it's time to call
- Signing a new commercial lease
- Converting space use (e.g., retail to restaurant)
- Adding restrooms or kitchen facilities
- ADA compliance upgrade required
- Existing rough-in doesn't match new layout
- GC needs a licensed plumbing sub
FAQ
Common questions
TI plumbing is typically bid from architectural drawings or a site walk. We provide a fixed-price proposal covering rough-in, finish work, permit fees, and inspection coordination. Change orders only happen when the scope changes — not because we missed something in the bid.
Yes. We work as the licensed plumbing subcontractor on GC-led TI projects regularly. We show up on schedule, pull our own permits, coordinate inspections, and communicate proactively so we don't add to your PM load.
For most TI projects, 2–4 weeks of lead time is sufficient for us to mobilize. Larger or more complex scopes — multiple restrooms, full restaurant kitchens, or medical office build-outs — benefit from earlier engagement so we can review plans and flag conflicts before work begins.
Yes. We handle ADA-compliant restroom rough-in and fixture installation, including accessible lavatory heights, clearances, and grab bar blocking. If ADA compliance is a condition of your permit or lease, we build it into the scope from the start.
Yes — restaurant TI is one of our most common commercial scopes. We rough in floor drains, grease waste lines, hand sinks, mop sinks, prep sinks, and hood suppression connections. We coordinate with health department requirements and your equipment vendor.
Yes. We are a licensed plumbing contractor and pull our own plumbing permits for every TI project. Permit fees are included in our proposal. We handle inspection scheduling and coordinate with the city's building department directly.
Timeline depends on scope, but most standard TI projects — new restrooms, kitchen rough-in, or a bar build-out — run 3–10 business days for rough-in, with finish work following after other trades are complete. We build our schedule around your GC's timeline and lease delivery date.
What Clients Say
Trusted by business owners
and GCs across the Bay Area.
“Guerra Bros. was our plumbing sub on a restaurant TI in Concord. They reviewed the plans early, flagged a drain conflict before we poured the slab, and never missed a coordination call. Permit passed first inspection.”
“We were self-managing a medical office build-out and needed a plumber who could handle permitting without hand-holding. Guerra Bros. took it from scope to final inspection. Straightforward, professional, done on time.”
“New retail space needed restrooms and a back-of-house sink rough-in. Guerra Bros. worked around the other trades, kept the schedule, and the permit closed clean. Would use them again on any commercial project.”
Where We Work
Tenant Improvement Plumbing near you.
Same-day service available in Concord, Walnut Creek, Martinez, and throughout Contra Costa County.
Don't see your city? Call us — we may still serve your area.
View all service areasRelated Services
More commercial services
For Commercial
Gas Line Services
Commercial gas line installation, repair, and pressure testing for kitchens, HVAC, and equipment connections.
View Service
Commercial gas work
For Commercial
Commercial Water Heaters
Installation, repair, and maintenance for commercial hot water systems of all sizes.
View Service
Hot water systems
For Commercial
Backflow Testing & Repair
Certified backflow preventer testing, repair, and installation — we file the compliance report for you.
View Service
Required at completion